Vehicular movement on the highway has come to a standstill due to the ice on the 16 kilometres stretch of the highway from local Dhunche to Ramche. The road remains blocked since Friday.
Siddhicharan highway blocked since three days
During her inspection of the Hetauda Industrial Area today, she emphasized the need to re-establish the garment sector to strengthen the country’s economic development.